CURRENT WATER LEVEL: 9 Inches below summer level (Last Update: 09-17-2026)

LSL Dock Removal

The State has scheduled the dock at the boat launch to be removed on Tuesday October 27th 2026. Please plan accordingly.

Maine DEP’s Herbicide Proposal

Canal

Many of you were aware that the Maine Department of Environmental Protection (DEP)
had proposed the use of the herbicide ProcellaCOR to remove milfoil from the “canal”
adjacent to the middle lake, between the boat launch and the lower narrows.

Water Quality Testing Buoys

WQ-Buoy

The LSLA Water Quality Team has obtained permission from the State to install three buoys used to mark the three locations where water testing is to be performed